Engineering delivery workflow

From demand to delivery. One controlled flow.

ARYXON keeps portfolio demand, approved planning, finite-capacity scheduling and live execution connected while preserving the authority of each stage.

01
DEMAND

See the engineering load before it becomes a delivery problem.

Sales Forecast represents prospective demand. Uploaded On-Hand represents governed committed portfolio demand. Both inform the portfolio without becoming a second Working Plan.

ARYXON Sales Forecast planning workspace
02
PLAN

Structure phases, tasks, hours, resources and dependencies.

Design Plan is the controlled planning workspace. It defines the engineering delivery structure and provides the planning inputs the Scheduler uses to calculate the project position.

ARYXON Design Plan workspace
03
SCHEDULE

Calculate dates against the capacity that actually exists.

The Scheduler owns calculated dates, sequencing, calendars, waiting periods, project priority and finite resource capacity. Screens consume those outcomes rather than maintaining competing calculations.

ARYXON Capacity workspace
04
APPROVE

Freeze the agreed plan without freezing the business.

Publication preserves the approved Baseline as the historical planning contract. The Working Plan is then created through a controlled handover with permanent source linkage.

ARYXON governed change control
05
EXECUTE

Let live work move without rewriting approved history.

Working Plan carries operational status, progress, remaining effort and current forecast consequences. It can evolve through controlled operational commands while the approved Baseline remains intact.

ARYXON Working Plan workspace
06
WORK

Give designers a focused queue for real engineering work.

My Work supports planned task execution and legitimate unplanned/support work while keeping actual work, absence and future interruptions conceptually separate.

ARYXON My Work workspace
07
EXPLAIN

See what moved, what consumed capacity and where pressure exists.

Capacity and Resource Load expose the portfolio consequence of current commitments so delivery movement can be explained with operational evidence rather than guesswork.

ARYXON Resource Load workspace

Controlled engineering truth

Approved. Live. Achievable.

ARYXON deliberately keeps three questions separate: what was approved, what is happening now, and when the work can occur under current rules and capacity.

APPROVED

Frozen Baseline

The immutable planning reference for approved scope, dates and engineering intent.

LIVE

Working Plan

The operational view of current status, progress, remaining work and execution changes.

ACHIEVABLE

Scheduler

The calculation authority for dates, dependencies, calendars, priorities and finite capacity.